Last updated November 9, 2026.

Short answer: State incentive programs change every year, and the changes rarely make the news. This page tracks each change that affects a manufacturing or industrial project: programs that were repealed or sunset, new programs, and tax changes that shift what a project is worth. Every entry links to the official source and to our full guide for that state. We update it weekly.

Jump to a state

2026 state incentive program changes

Nov 6, 2026 · AlabamaProgram change

Alabama’s new Opportunity Zone map has 141 tracts, down from 158

What changed: Treasury and the IRS approved 141 Alabama tracts under the renewed federal Opportunity Zone program: 65 rural and 76 non-rural, in 66 counties. The first round had 158 tracts. The new zones take effect Jan. 1, 2027 and last ten years.

What it means for your project: Fewer tracts means some sites that qualified before will not after the new map starts. Check any Alabama site that depends on Opportunity Zone equity against the 2027 list.

Source: Alabama Governor, Alabama’s Opportunity Zones 2.0 Nominations Approved, ADECA, Opportunity Zones. Full guide: Alabama incentive programs.

Nov 6, 2026 · WashingtonNew program

Washington’s sustainable aviation fuel tax credit is now available

What changed: The Department of Ecology confirmed that Washington producers can now make at least 20 million gallons of sustainable aviation fuel a year. That was the threshold set in ESSB 5447 (2023) to turn the credit on. The credit is $1 per gallon for jet fuel with at least 50% lower greenhouse gas emissions than conventional jet fuel, and up to $2 per gallon for fuel with lower emissions.

What it means for your project: For a fuel producer comparing sites, Washington’s per gallon credit is now real money and belongs in the operating cost model. The credit scales with emissions, so the fuel pathway you choose changes the value.

Source: Washington Governor, Governor Ferguson announces new tax credit to accelerate Washington’s emerging sustainable aviation fuel industry, Washington Legislature, ESSB 5447 (2023) session law. Full guide: Washington incentive programs.

Nov 5, 2026 · MissouriProgram change

Missouri gets 131 new Opportunity Zone tracts starting in 2027

What changed: Treasury approved all 131 tracts Missouri nominated under the renewed federal Opportunity Zone program. 131 is the maximum allowed, 25% of eligible tracts. The new zones take effect Jan. 1, 2027 and last ten years.

What it means for your project: If a project will use Opportunity Zone equity, confirm the site is in a new tract. The 2018 map is not the one investors will use for new money after 2026.

Source: Missouri Governor, Missouri Secures Approval of 131 Opportunity Zones, U.S. Treasury, Opportunity Zones designations announcement. Full guide: Missouri incentive programs.

Nov 5, 2026 · IllinoisProgram change

Illinois gets 240 new Opportunity Zone tracts starting in 2027

What changed: Treasury approved 240 Illinois census tracts as Opportunity Zones under the renewed federal program. 32.5% qualify as rural Opportunity Zones, which carry larger investor benefits. The designations take effect in January 2027 and last ten years.

What it means for your project: Check sites against the new map before you shortlist. Rural tracts carry the larger investor benefit, which can help a project in a small market raise equity.

Source: Illinois Governor, press release on Opportunity Zone designations, U.S. Treasury, Opportunity Zones designations announcement. Full guide: Illinois incentive programs.

Nov 5, 2026 · North CarolinaProgram change

North Carolina gets 204 new Opportunity Zone tracts starting in 2027

What changed: Treasury certified North Carolina’s 204 Opportunity Zone tracts under the renewed federal program. The state placed 93 tracts with one in each county that had eligible tracts, 103 by county population share, and 8 in rural Tier 1 counties. Treasury designated 6,576 tracts nationwide. The new zones take effect Jan. 1, 2027 and last ten years.

What it means for your project: If a project will use Opportunity Zone equity, check the site against the new map, not the 2018 one. A site in a new tract can help attract investors and lower the cost of capital.

Source: NC Commerce, Governor Stein Announces New Opportunity Zone Designations, U.S. Treasury, Opportunity Zones designations announcement. Full guide: North Carolina incentive programs.

Nov 3, 2026 · FloridaTax change

Florida voters cut the assessment growth cap on business property to 5%

What changed: Voters approved Amendment 3 (CS/HJR 1-F) with 61.98% of the vote in unofficial state results. Amendments need 60%. It cuts the annual cap on assessment growth for non-homestead residential and non-residential real property from 10% to 5%. It also raises homestead exemptions from non-school levies and limits what counties and cities can spend property tax revenue on. It takes effect Jan. 1, 2027.

What it means for your project: Owned plants and warehouses in Florida will see taxable value grow more slowly in a rising market. Counties and cities lose revenue, so expect local budgets to tighten. Factor that into local incentive requests.

Source: Florida Department of State, Election Watch amendment results, Florida Senate, CS/HJR 1-F bill summary. Full guide: Florida incentive programs.

Oct 29, 2026 · LouisianaRule change

Louisiana finalizes the conditions for its data center sales tax exemption

What changed: LED published the Ratepayer and Community Protection Framework required by Executive Order JML 26-058. Before receiving the Data Center Sales and Use Tax Exemption, a company must submit a detailed attestation showing how it will meet commitments in eight areas: protecting ratepayers from cost shifts, grid reliability, workforce partnerships, local tax base and public services, natural resources and water use, community investment beyond the site, Louisiana’s innovation economy, and transparency. Companies must set measurable commitments, report progress to LED for the life of the project, and show how Louisiana contractors and vendors are being used. LED now calls data centers digital factories, but the exemption keeps its statutory name.

What it means for your project: The exemption is no longer a straight statutory benefit. The attestation becomes part of the deal, and the commitments are open ended, so negotiate their scope and how they are measured before you sign. Price the reporting and community commitments into the project’s net benefit.

Source: LED, Ratepayer and Community Protection Framework, Louisiana Governor, Executive Order JML 26-058. Full guide: Louisiana incentive programs.

Oct 27, 2026 · MichiganProgram change

Michigan adds grants and sets award limits in the Brownfield Site Investment Program

What changed: On Oct. 27, 2026, the Michigan Strategic Fund board amended the Brownfield Site Investment Program guidelines. The program can now pair grant awards with its loan awards. Awards have a $50,000 minimum and a $1 million maximum. The board also amended Michigan Innovate Capital Fund guidelines to tie loan terms to the repayment source and risk, clarify maximum maturities, and loosen purchase order financing rules for early stage companies.

What it means for your project: Brownfield site work in Michigan can now get some grant money instead of only a loan, but $1 million is the ceiling. Bigger site cleanups still need Act 381 tax capture or other sources.

Source: MEDC, MSF Board approves measures for affordable housing, public infrastructure improvements across the state. Full guide: Michigan incentive programs.

Oct 27, 2026 · IndianaNew program

Indiana opens ADAPT grants for small and midsize auto suppliers

What changed: Indiana launched ADAPT, funded by a $10.79 million U.S. Department of Energy award. Grants run $100,000 to $1 million and require at least a 1:1 company match in each expense category, including capital equipment, capital software and workforce training. Awards are reimbursements. Applicants must be Indiana headquartered, for-profit auto manufacturers with fewer than 1,500 employees (preference for 500 or fewer) that mainly make parts for internal combustion vehicles, and the project must add capability for hybrid, plug-in hybrid, battery electric or fuel cell vehicles. Applications are due Jan. 8, 2027. IEDC and DOE both approve awards, and projects must be done by Dec. 31, 2028.

What it means for your project: For a qualifying supplier this is matching money for retooling and training, but it comes with federal sub-recipient reporting every quarter. Spend has to wait for approval, so line up the project timeline with a spring 2027 award.

Source: Indiana Governor, Gov. Braun Powers Automotive Industry, Jobs with $10M+ Grant Program. Full guide: Indiana incentive programs.

Oct 14, 2026 · IowaRule change

Iowa proposes a rule on how federal credits count toward the Redevelopment Tax Credit

What changed: Regulatory Analysis 26-329, published October 14, 2026, proposes amending rule 261-65.3 on limits to qualifying investment. It clarifies how federal tax credits are treated when qualifying investment is calculated for the brownfield and grayfield Redevelopment Tax Credit. The public hearing and comment deadline is November 3, 2026.

What it means for your project: A redevelopment deal that stacks the Iowa credit with historic, NMTC or other federal credits could see its eligible basis change. Model both readings now and comment before November 3 if it affects your numbers.

Source: Iowa Administrative Bulletin, Oct 14, 2026 (RA 26-329). Full guide: Iowa incentive programs.

Oct 5, 2026 · North DakotaProgram change

North Dakota opens a new LIFT technology loan round

What changed: The LIFT application round opened October 5, 2026 and closes November 9, 2026. Loans carry 0% interest for 3 years, 2% for the next 2 years, then a standard Bank of North Dakota rate. Eligible sectors include advanced computing and data management, ag tech, autonomous and unmanned vehicles, energy, healthcare, and value-added agriculture and energy. Commerce did not publish a funding total for this round.

What it means for your project: Low-cost capital for North Dakota companies in these sectors, including value-added ag and energy manufacturers. The window is five weeks.

Source: ND Commerce, Application period for LIFT Program opens Oct. 5. Full guide: North Dakota incentive programs.

Oct 2026 · MontanaPaused

Montana’s Big Sky Trust Fund is not taking applications

What changed: The Montana Department of Commerce lists the Big Sky Economic Development Trust Fund, the state’s job creation grant program, as not accepting applications. Separately, HB 908 (2025) removed the end-of-2028 sunset on the Job Growth Incentive Tax Credit, which covers 50% of employer FICA for up to 7 years on new jobs paying $50,000 or more.

What it means for your project: Do not count on a Big Sky Trust Fund grant in a current Montana project budget. The Job Growth credit and the new or expanding industry property tax abatement are the tools that remain.

Source: Montana Commerce, Big Sky Economic Development Trust Fund, Montana Code Annotated, Job Growth Incentive Tax Credit. Full guide: Montana incentive programs.

Oct 2, 2026 · IowaProgram change

Iowa adds a 10% refundable MEGA credit for one project in a rural county

What changed: House File 2801, passed in an October 2, 2026 special session and effective on enactment, lets IEDA award one business a qualifying investment credit of up to 10% for a project in a county of 50,000 people or fewer. The credit is paid out over 10 years, is refundable, and can be transferred with IEDA approval for agreements entered through December 31, 2027. Recapture runs on a 10 year sliding scale. If the 10% credit is used, the board can authorize MEGA benefits for only one business, instead of two at up to 5%. The site must be over 250 acres or have a site evaluation equal to a certified site.

What it means for your project: This was written for one very large rural project, and once it is awarded the program is effectively closed to everyone else. For any other mega project, MEGA in Iowa should now be treated as unavailable unless the legislature reopens it.

Source: Iowa Legislature, HF 2801 enrolled text, Iowa Senate Journal, Oct 2, 2026 special session. Full guide: Iowa incentive programs.

Oct 1, 2026 · ConnecticutProgram change

Connecticut adds a second Airport Development Zone in Plainville

What changed: Public Act 26-104 (SB 134) took effect October 1, 2026. It adds nine census blocks in Plainville as a new airport development zone. The only other zone is around Bradley. Zone status brings enterprise zone benefits, including an 80% property tax exemption for 5 years for qualifying manufacturing facilities with a DECD eligibility certificate.

What it means for your project: A manufacturer siting inside this small Plainville footprint can apply for enterprise zone level benefits through DECD. Check the census block list before building a site case around it.

Source: CGA, SB 134 bill status (2026), Public Act 26-104. Full guide: Connecticut incentive programs.

Oct 1, 2026 · OhioProgram change

Ohio reopens TechCred with an approved credential list

What changed: The round opened October 1, 2026 and closes at 3 p.m. on October 30, 2026. Under guidelines released August 19, 2026, employers must pick from a new approved list of technology credentials or ask for a new one to be considered. Reimbursement stays at up to $1,000 per employee per credential, capped at $30,000 per application period.

What it means for your project: Manufacturers that used TechCred for general upskilling should confirm their planned credentials are on the new list before applying. The deadline is close.

Source: Ohio Development, New round of TechCred applications (Oct 1, 2026), Ohio Development, TechCred new guidelines (Aug 19, 2026). Full guide: Ohio incentive programs.

Oct 1, 2026 · PennsylvaniaRule change

Pennsylvania requires a Letter of Intent before a PA SITES application

What changed: DCED changed the PA SITES application process effective Oct. 1, 2026. After Sept. 30, 2026, every applicant must first submit a Letter of Intent under the September 2026 guidelines. PA SITES offers planning grants and construction grants and loans for site development, with no set minimum or maximum award. Eligible applicants include municipalities, economic development organizations, redevelopment and municipal authorities, industrial development agencies and for-profit companies.

What it means for your project: Getting a site funded now takes an extra step and more lead time. If a project depends on a PA SITES award for site readiness, get the Letter of Intent in early and build the wait into the schedule.

Source: PA DCED, PA SITES program page. Full guide: Pennsylvania incentive programs.

Sep 30, 2026 · MichiganSunset

Michigan Business Development Program sunsets

What changed: The Michigan Business Development Program (MBDP), the state’s main performance-based grant and loan program for job creation, ended September 30, 2026. MEDC had already stopped approving new awards. Two weeks earlier, on September 17, MEDC announced it would cut about 15% of its staff.

What it means for your project: A new Michigan project can no longer count on an MBDP cash grant. If MBDP was part of your project math, check the status of any pending award and put another state on the list. Michigan’s property tax tools, like PA 198 abatements and Renaissance Zones, still work.

Source: House Fiscal Agency, FY2026-27 budget conference summary, The Incentives Negotiator, Sep 30, 2026. Full guide: Michigan incentive programs.

Sep 30, 2026 · North CarolinaRule change

North Carolina local governments must report economic development payments over $25,000

What changed: S.L. 2026-41 requires local governments and public authorities to notify the State Auditor of any economic development disbursement over $25,000. Economic development appropriations may be used only for purposes expressly authorized by law. It applies to budgets adopted and payments made on or after July 7, 2026. The Treasurer published guidance September 30, 2026.

What it means for your project: Local cash incentives in North Carolina now leave a public record with the State Auditor. Expect counties to be more careful about how local grant agreements are structured and documented.

Source: NC Treasurer, New reporting requirements under S.L. 2026-41, S.L. 2026-41. Full guide: North Carolina incentive programs.

Sep 23, 2026 · OhioRule change

Ohio speeds up TIF approvals and gives lapsed Enterprise Zone exemptions a fix window

What changed: House Bill 479 took effect. TIF exemption applications can now be filed before the tax year. If the Tax Commissioner does not act within one year, the application is deemed approved. Certain Enterprise Zone property gets a 12-month window to fix lapsed exemptions.

What it means for your project: TIF-backed projects in Ohio get more certainty on timing. If a past Enterprise Zone exemption lapsed on a paperwork issue, there is now a window to restore it.

Source: House Bill 479 (136th General Assembly). Full guide: Ohio incentive programs.

Sep 17, 2026 · NevadaRule change

Nevada adds conditions to data center tax abatements

What changed: Executive Order 2026-005, signed September 17, 2026, lets a data center abatement go to the GOED Board only if it keeps a combined sales and use tax rate of at least 4.6%. The state sales tax and the Local School Support Tax cannot be abated. Applicants must sign a binding Community Support Commitment covering water, ratepayers, grid reliability, siting, workforce and transparency, with suspension and recapture for uncured failures. It applies to every application the Board has not yet acted on. GOED must publish the uniform terms by November 6, 2026.

What it means for your project: Data center projects in Nevada now get a smaller abatement plus enforceable operating obligations. Projects already in the pipeline are covered. Expect the recapture terms to be a negotiation point.

Source: Nevada Governor, Executive Order 2026-005, Nevada Governor, press release (Sep 18, 2026). Full guide: Nevada incentive programs.

Sep 16, 2026 · IowaRule change

Iowa starts rules for the BIG Training Fund and a headquarters EDGE credit

What changed: Regulatory Analysis 26-283 proposes amending the Business Incentives for Growth rules. It clarifies how costs tied to buying a business as a going concern are treated and sets terms for the BIG Training Fund created by HF 2799. Regulatory Analysis 26-284 proposes rules for the new Headquarters Expansion and Development for Growth Employment (EDGE) credit. The hearing was October 6, 2026. Notices of Intended Action had not been published as of October 14.

What it means for your project: A project that buys an existing Iowa business needs to know how the purchase price counts toward BIG investment, and these rules will settle that. The training fund and headquarters credit are new tools to ask for once the rules are final.

Source: Iowa Administrative Bulletin, RA 26-283 (BIG), Iowa Administrative Bulletin, RA 26-284 (EDGE). Full guide: Iowa incentive programs.

Aug 28, 2026 · MissouriNew program

Missouri creates a critical materials and pharmaceuticals credit

What changed: SB 1553, signed July 13, 2026, created a credit of 20% of project costs for critical materials and pharmaceutical projects of $5 million to under $15 million, and 25% for projects of $15 million or more. The program has a $40 million yearly cap. Credits start January 1, 2027, and the program sunsets December 31, 2036.

What it means for your project: Critical minerals processors and drug manufacturers looking at Missouri should apply early. A $40 million yearly cap goes quickly.

Source: Missouri Senate, SB 1553 (2026). Full guide: Missouri incentive programs.

Aug 28, 2026 · MissouriNew program

Missouri adds an investment credit to Missouri Works

What changed: HB 3231, signed July 13, 2026, created Missouri Works Investment Works. It offers a credit of up to 2.5% of new capital investment for projects that invest $50 million, or $30 million in a certified Missouri Innovation Zone, within two years. The same bill created Missouri Innovation Zones. State guidelines are expected in April 2027.

What it means for your project: Missouri Works used to pay mainly on new jobs. Capital-heavy projects with few jobs now have a Missouri credit they can model.

Source: Missouri DED, Missouri Works Investment Works. Full guide: Missouri incentive programs.

Aug 27, 2026 · New JerseyFunding cut

New Jersey halves Next NJ AI and closes it to new applications

What changed: S4390, signed August 27, 2026, cut total authorized credits under Next New Jersey Program AI from $500 million to $250 million. NJEDA says the credits are fully allocated and it is not accepting new applications.

What it means for your project: There is no state tax credit path left for new AI data center projects in New Jersey. Plan on local PILOTs and other tools.

Source: NJEDA, Next New Jersey Program AI. Full guide: New Jersey incentive programs.

Aug 26, 2026 · DelawareRule change

Delaware limits job and investment credits for very large power users

What changed: HB 310 (85 Del. Laws c. 441) excludes large energy use facilities, including data centers of 30 MW or more, from qualified facility status for Delaware’s job and investment credits unless all of their energy comes from in-state or DPL-zone clean generation.

What it means for your project: Very large power users cannot count on Delaware’s Blue Collar or license fee credits without a clean power plan. Most manufacturers fall below the threshold, but energy-intensive plants should check.

Source: Delaware General Assembly, HB 310. Full guide: Delaware incentive programs.

Aug 18, 2026 · PennsylvaniaRule change

Pennsylvania ties the data center equipment exemption to the GRID requirements

What changed: Executive Order 2026-05, signed August 18, 2026, directs Revenue to deny the Computer Data Center Equipment sales and use tax exemption to applicants that do not meet the Governor’s GRID Requirements. DEP reviews permits only after the developer signs a binding consent order committing to GRID, and issues none until local approvals are in place. GRID covers paying the full cost of new generation and transmission, community engagement, local hiring, and water and environmental standards. Data centers were removed from the Permit Fast Track Program.

What it means for your project: In Pennsylvania the equipment exemption now depends on a signed consent order. Budget the GRID cost items and get local approvals first. Fast Track permitting is off the table for data centers.

Source: PA Governor, Executive Order on data center development, Executive Order 2026-05. Full guide: Pennsylvania incentive programs.

Aug 12, 2026 · ColoradoExtension

Colorado extends the Job Growth Incentive Tax Credit through 2034

What changed: HB26-1014 lets the Economic Development Commission approve new Job Growth Incentive Tax Credit awards through tax year 2034. The old limit was tax year 2026. The bill was signed May 29, 2026 and took effect August 12, 2026.

What it means for your project: Colorado’s main job creation credit stays available for projects deciding over the next several years. It still has to be approved before the location decision, so get into the process early.

Source: Colorado General Assembly, HB26-1014. Full guide: Colorado incentive programs.

Aug 3, 2026 · IllinoisNew program

Illinois opens the AIM investment credit

What changed: DCEO opened applications for the AIM credit, created by P.A. 104-6 in June 2025. AIM is a credit of 3%, 5%, or 7% of capital investment for projects investing $10 million or more. Awards start January 1, 2027, and no new agreements can be signed after December 31, 2030. Operations must stay in Illinois for 15 years, and the full credit is recaptured if the company closes to leave the state.

What it means for your project: Illinois now has a credit tied to capital, not just jobs. Read the 15-year commitment and recapture terms before you count it.

Source: P.A. 104-6 (HB 2755), DCEO, AIM program launch materials. Full guide: Illinois incentive programs.

Jul 23, 2026 · New JerseyPaused

New Jersey pauses new Aspire applications

What changed: NJEDA paused new applications to Aspire, its real estate development credit, and expects to reopen it in fall 2026 with revised criteria.

What it means for your project: Developers counting on Aspire for a New Jersey industrial or mixed-use project should wait for the revised rules before locking a budget.

Source: NJEDA, Aspire. Full guide: New Jersey incentive programs.

Jul 15, 2026 · New YorkNew program

New York launches a semiconductor manufacturing workforce training credit

What changed: Empire State Development launched the Semiconductor Manufacturing Workforce Training Incentive Program on July 15, 2026. Credits cover up to 75% of eligible training costs, up to $25,000 per trainee. Semiconductor manufacturers can receive up to $5 million over the life of the program and other manufacturers up to $1 million. The training plan must be approved before training starts.

What it means for your project: A real training subsidy for chip and other manufacturers expanding in New York. Get the plan approved before the first class, or the costs do not count.

Source: ESD, Launch of new semiconductor manufacturing workforce training program. Full guide: New York incentive programs.

July 2026 · MichiganFunding cut

Michigan’s FY2027 budget adds no money to SOAR and ends the 21st Century Jobs Fund appropriation

What changed: The FY2027 budget put no new money into SOAR, the state’s deal-closing fund, for the second year in a row. It removed all funding for the business attraction and community revitalization line and ended the roughly $75 million a year appropriation from the 21st Century Jobs Trust Fund, which is funded by tobacco settlement money. The administration also plans to lapse about $449 million of SOAR’s uncommitted balance outside the budget bill, according to the State Budget Office. It also requires the Michigan Strategic Fund to post draft agreements before approving a grant, loan, or company-specific tax credit.

What it means for your project: Large Michigan cash awards now depend on money already appropriated. Expect smaller offers, more public scrutiny of each deal, and a slower approval process.

Source: House Fiscal Agency, FY2026-27 budget conference summary. Full guide: Michigan incentive programs.

Jul 13, 2026 · CaliforniaExtension

California extends California Competes through 2033

What changed: SB 180 (Chapter 85, Statutes of 2026) extended the California Competes Tax Credit at $180 million a year through fiscal year 2032-33. The California Competes Grant has not been funded since 2023.

What it means for your project: California Competes is still the state’s main negotiated credit for a new plant. Do not plan on a cash grant.

Source: SB 180 (2026). Full guide: California incentive programs.

Jul 7, 2026 · North CarolinaRepeal

North Carolina repeals the sales tax exemption on data center electricity

What changed: S.L. 2026-41 repealed the sales tax exemptions for electricity used at certified data centers, effective July 7, 2026. Tax applies starting with the first billing period that begins on or after August 6, 2026. Exemptions for data center equipment and infrastructure stay in place. Purchasers report tax paid quarterly, with the first report due October 30, 2026.

What it means for your project: Power at a North Carolina data center now carries the combined general sales tax rate, which raises operating cost models directly. The capital side exemptions still apply.

Source: NCDOR, Repeal of exemptions for electricity used at datacenters. Full guide: North Carolina incentive programs.

Jul 1, 2026 · VirginiaNew tax

Virginia taxes electricity used at data centers

What changed: The 2026 budget (HB 30, Item 3-5.24) imposes $0.011 per kWh on all electricity consumed at each data center, grid or self-supplied, from July 1, 2026 to before July 1, 2028. The State Corporation Commission collects it monthly, starting in September 2026. Up to $600 million a year goes to the general fund. Any excess is refunded pro rata starting in fiscal 2028.

What it means for your project: Virginia kept the data center sales tax exemption but added an operating cost tied to power use. Every Virginia data center model needs this line item.

Source: Virginia budget, HB 30 Item 3-5.24 #1c. Full guide: Virginia incentive programs.

Jul 1, 2026 · MarylandProgram overhaul

Maryland’s DECADE Act raises MEDAAF limits and creates a Strategic Closing Fund

What changed: The DECADE Act (Chapter 352 of 2026) raised MEDAAF limits to $7.5 million for loans and investments and $5 million for grants, and removed the 10% local match. It renamed the Sunny Day Fund the Strategic Closing Fund and moved it to the Department of Commerce. It extended the Job Creation Tax Credit to January 1, 2032.

What it means for your project: Maryland can now make larger awards without the county putting up a match. Large deal-closing money runs through Commerce.

Source: HB 898 (2026), Maryland General Assembly, Maryland Commerce, Strategic Closing Fund. Full guide: Maryland incentive programs.

Jul 1, 2026 · ArizonaPaused

Arizona pauses new data center tax exemption certifications until mid-2029

What changed: The 2026-27 tax omnibus bars the Arizona Commerce Authority from accepting applications from, or granting tax relief to, any new computer data center from July 1, 2026 through June 30, 2029. The provision is retroactive to July 1, 2026. Data centers already certified keep their transaction privilege and use tax exemptions.

What it means for your project: New Arizona data center projects carry full state and local TPT on equipment for at least three years. Expansions under an existing certification should confirm with ACA what the current certificate covers.

Source: Arizona Legislature, enacted fact sheet (tax omnibus, computer data centers), Arizona Legislature, HB 4168 House summary. Full guide: Arizona incentive programs.

Jul 1, 2026 · IowaProgram overhaul

Iowa repeals the New Jobs Tax Credit and tightens 260E training

What changed: HF 2799, signed June 2, 2026, repealed the New Jobs Tax Credit. For 260E new jobs training agreements signed from July 1, 2026, the repayment period is 7 years instead of 10, bonds are limited to 70% of training costs, and college administrative costs are capped at 15%. The law also created an EDGE headquarters credit and a BIG training fund. IEDA expects the training fund to open in spring 2027. A legislative study of 260E is due December 15, 2026.

What it means for your project: Iowa training money for a new plant is smaller and paid back faster than it was. Expect more changes to 260E after the December study.

Source: HF 2799 (2026), Legislative Services Agency summary. Full guide: Iowa incentive programs.

Jul 1, 2026 · IllinoisPaused

Illinois stops processing data center incentive applications

What changed: Under a June 5, 2026 directive from the Governor, DCEO stopped processing applications for the Data Center Investment Program as of July 1, 2026. The program provides state and local sales and use tax exemptions for data centers with at least $250 million in capital investment and 20 jobs. DCEO has not published an end date for the pause.

What it means for your project: There is no state tax exemption path for a new Illinois data center right now. Any project still sited there needs a model without the exemption, and should watch the fall session for the rules that replace it.

Source: DCEO, Data Center Investment Tax Exemptions and Credits. Full guide: Illinois incentive programs.

Jun 30, 2026 · New JerseyTax change

New Jersey caps NOL deductions at $1 million a year

What changed: A5322, passed with the FY2027 budget, put a temporary $1 million cap on Corporation Business Tax net operating loss deductions for privilege periods ending July 31, 2026 through July 31, 2030. The 2.5% Corporate Transit Fee on companies with more than $10 million of New Jersey taxable income also stays in place through 2028, and tax credits cannot offset it.

What it means for your project: Companies with large New Jersey losses will pay tax sooner than they planned. Emerge and Next NJ credits do not reduce the transit fee, so model it separately.

Source: A5322 (2026), NJ Division of Taxation, Corporate Transit Fee. Full guide: New Jersey incentive programs.

Jun 29, 2026 · CaliforniaTax change

California keeps the $5 million cap on business credits through 2029

What changed: SB 167 and SB 175 (2024) capped business credits at $5 million a year and suspended NOL deductions for companies with $1 million or more of income, for tax years 2024 through 2026. SB 122 (Chapter 23, Statutes of 2026) extended the $5 million credit cap through tax years beginning before 2030. After that, the cap becomes the greater of 70% of tax or $5 million. SB 122 also adds sales tax on digital products and remotely accessed software from January 1, 2027.

What it means for your project: A large company may not be able to use more than $5 million a year of California credits, including California Competes and R&D credits, until 2030. Model when the credits can actually be used, not just the award amount.

Source: SB 122 (2026). Full guide: California incentive programs.

Jun 25, 2026 · LouisianaRule change

Louisiana ties the data center sales tax exemption to a ratepayer and community framework

What changed: Executive Order JML 26-058, announced June 25, 2026, directs LED to set a Ratepayer and Community Protection Framework as a condition of the Data Center Sales and Use Tax Exemption. Companies must submit detailed attestations covering ratepayer protection, grid reliability investment, local tax base contributions, workforce, natural resources, community investment and transparency. LED had 90 days to propose criteria and an implementation plan to the Governor.

What it means for your project: The Louisiana exemption now comes with commitments a company has to sign up to. Ask LED for the current criteria before relying on the exemption in a site comparison.

Source: LED, Louisiana Sets New National Standard for Responsible Industrial Growth. Full guide: Louisiana incentive programs.

Jun 16, 2026 · IllinoisExtension

Illinois extends REV and the R&D credit and caps NOL deductions

What changed: P.A. 104-468 (SB 3019) moved the deadline for new REV agreements from December 31, 2027 to December 31, 2028. It extended the R&D credit to January 1, 2037. It also caps corporate NOL deductions at the greater of $500,000 or 15% of income for tax years ending on or after December 31, 2027, stepping up over time to 80%.

What it means for your project: EV, battery, and clean energy manufacturers get one more year to sign a REV agreement. Companies with large Illinois losses carried forward will use them more slowly.

Source: P.A. 104-468 (SB 3019). Full guide: Illinois incentive programs.

Jun 11, 2026 · FloridaTax change

Florida does not follow new federal expensing for factories and R&D

What changed: HB 7031 (2026), retroactive to January 1, 2026, decoupled Florida’s corporate income tax from new federal expensing for qualified production property (IRC 168(n)) and domestic research costs (IRC 174A).

What it means for your project: A new Florida plant cannot deduct the building in year one for state tax purposes, even if it can for federal tax. Model Florida depreciation separately.

Source: Florida Department of Revenue, TIP 26C01-01. Full guide: Florida incentive programs.

Jun 8, 2026 · VermontExtension

Vermont makes VEGI permanent

What changed: S.327 (Act 128 of 2026) repealed the sunset on the Vermont Employment Growth Incentive, which had been set to end January 1, 2027. The same act authorized municipal C-PACE districts.

What it means for your project: VEGI cash incentives stay available for Vermont projects that apply after 2026. Every county except Chittenden and Washington qualifies for the enhanced VEGI calculation through June 2026.

Source: Vermont Legislature, S.327 (2026), Vermont ACCD, VEGI. Full guide: Vermont incentive programs.

Jun 5, 2026 · OregonProgram overhaul

Oregon overhauls enterprise zones

What changed: HB 4084 (Chapter 50, Oregon Laws 2026) allows enterprise zone exemptions of up to 10 years, makes zone designation need-based, counts job retention and wage growth, and restricts data centers. It also created a fast-track permitting council and added money to the Industrial Site Loan Fund. Strategic Investment Program thresholds rose to $162.8 million urban and $43.4 million rural on July 1, 2026.

What it means for your project: Longer property tax abatements are now possible in Oregon. Check the local zone sponsor’s current terms before filing.

Source: HB 4084 (2026), Oregon Legislature, Business Oregon, Strategic Investment Program. Full guide: Oregon incentive programs.

Jun 1, 2026 · AlabamaNew tax

Alabama adds a 0.75% tax on materials in abated projects

What changed: Act 2025-84 created a 0.75% state construction-related transaction tax on materials built into projects receiving Chapter 9B or 9G abatements, effective June 1, 2026.

What it means for your project: A sales and use tax abatement in Alabama no longer zeroes out tax on construction materials. Build the 0.75% into the project budget and the incentive value.

Source: Alabama Department of Revenue, construction-related transaction tax notice. Full guide: Alabama incentive programs.

2026 · ConnecticutTax change

Connecticut decouples from federal factory expensing and adds an R&D credit for pass-throughs

What changed: 2026 legislation decoupled Connecticut from federal 100% expensing for qualified production property (IRC 168(n)) and delayed conformity to IRC 174A by one year. It also created an R&D credit for partnerships and S corporations of 6% of qualified expenses, capped at $1.5 million per taxpayer and $25 million a year statewide.

What it means for your project: A new Connecticut plant will show higher state taxable income than federal in the build year. Pass-through manufacturers doing R&D can now claim a credit, but the statewide cap makes timing matter.

Source: Connecticut DRS, 2026 state tax developments. Full guide: Connecticut incentive programs.

May 27, 2026 · OhioPaused

Ohio pauses new data center sales tax exemption requests

What changed: On May 27, 2026, the Governor directed the chair of the Ohio Tax Credit Authority to pause consideration of new data center sales and use tax exemption requests under ORC 122.175 while the Joint Data Center Committee studies data center growth. The Authority stopped taking new proposals after its June 1, 2026 meeting. Existing exemptions are not affected.

What it means for your project: New Ohio data center projects cannot count on the equipment exemption until the pause is lifted. Build the model without it and track the Joint Data Center Committee.

Source: Ohio Governor, Governor DeWine Announces Pause of Data Center Tax Exemption, Ohio Revised Code 122.175. Full guide: Ohio incentive programs.

May 20, 2026 · New MexicoExtension

New Mexico extends the High Wage Jobs credit to 2036 and decouples from federal expensing in 2027

What changed: SB 151 (2026, chapter 69) extended the High Wage Jobs Tax Credit to jobs created before July 1, 2036. The old cutoff was July 1, 2026. Starting with tax year 2027, the same law decouples New Mexico from federal bonus depreciation (IRC 168(k)), 100% expensing for qualified production property (IRC 168(n)), and the 163(j) interest rules, and adds back GILTI income.

What it means for your project: New Mexico’s refundable High Wage credit stays available for a new plant. But capital-heavy projects lose the state benefit of federal full expensing from 2027, so model higher New Mexico taxable income in the early years.

Source: SB 151 (2026) fiscal impact report. Full guide: New Mexico incentive programs.

May 18, 2026 · IowaRule change

Iowa limits new TIF districts to 23 years

What changed: SF 2472, signed May 18, 2026, limits new TIF districts to 23 years. Older districts with no end date are limited to 60% of increment after 20 years.

What it means for your project: City TIF packages in Iowa now have a hard end date. A long-term rebate built on TIF needs to fit inside 23 years.

Source: Office of the Governor of Iowa, May 19, 2026. Full guide: Iowa incentive programs.

May 11, 2026 · GeorgiaRepeal

Georgia HB 463 repeals several credits and shortens carryforwards

What changed: HB 463 (Act 465 of 2026) repealed, effective January 1, 2026, the port activity credit bonus, the headquarters credit, the PPE and life sciences manufacturing job credits, the electric vehicle and charger credits, and several smaller credits. It also repealed sales tax exemptions for high-technology computer equipment and data center equipment and ended new pollution control certificates. Unused Job Tax Credit, investment, retraining, and research credits from 2025 forward now carry forward 5 years instead of 10. The income tax rate is 4.99% for 2026.

What it means for your project: Georgia offers still lean on the Job Tax Credit, Quality Jobs, and local bond-for-title abatements, but credits must now be used faster. A company that cannot absorb credits within 5 years should model that loss.

Source: HB 463 (2026), as signed, Georgia DOR, repealed tax credits. Full guide: Georgia incentive programs.

Apr 27, 2026 · KentuckyProgram overhaul

Kentucky HB 869 replaces enhanced counties with heritage counties and raises KBI wage floors

What changed: HB 869 replaced the enhanced incentive county system with heritage counties, raised Kentucky Business Investment (KBI) wage floors to 200% and 300% of the federal minimum wage, and created a refundable KBI credit. It also raised the KPDI per-county cap to $2.5 million in heritage counties and the skills training credit limit to $4,500 per trainee in heritage counties and $3,500 elsewhere.

What it means for your project: Check whether your county is on the heritage list before modeling a Kentucky KBI offer. Higher wage floors mean some lower-wage jobs no longer count.

Source: HB 869 (2026 Regular Session). Full guide: Kentucky incentive programs.

Apr 17, 2026 · NebraskaProgram change

Nebraska raises ImagiNE credits for rural manufacturers and closes the Urban Redevelopment Act

What changed: LB 1165 (2026) raised ImagiNE credits for rural manufacturing growth and expansion projects to a 7% wage credit and a 5% investment credit, or 8% on investment over $10 million. It also created the Grow the Good Life Act, with a $50 million total cap. Earlier, LB 650 (2025) closed the Urban Redevelopment Act to new applications on May 6, 2025, and LB 644 (2025) made companies tied to foreign adversary countries ineligible for state incentives starting October 1, 2025.

What it means for your project: Rural Nebraska manufacturing expansions earn more per dollar under ImagiNE. Urban projects now use ImagiNE or local TIF. Screen ownership before applying.

Source: Nebraska DOR, 2026 legislative changes, Nebraska DOR, Urban Redevelopment Act. Full guide: Nebraska incentive programs.

Apr 9, 2026 · KansasExtension

Kansas extends the Angel Investor Tax Credit to 2031; corporate rate stays put

What changed: HB 2464 (2026 Session Laws, chapter 94) extended the Angel Investor Tax Credit to 2031 with an $8 million annual cap and a 25% rural set-aside starting in tax year 2027. HB 2336, which would have triggered corporate rate cuts, died in the 2026 session. The corporate rate stays at 4% plus a 3% surtax on income over $50,000.

What it means for your project: Kansas incentive offers still run through PEAK, HPIP, and local property tax exemptions. Do not model a lower Kansas corporate rate.

Source: 2026 Session Laws, chapter 94 (HB 2464), Kansas Legislature, HB 2336. Full guide: Kansas incentive programs.

Apr 3, 2026 · WisconsinNew program

Wisconsin creates a state New Markets Tax Credit

What changed: 2025 Wisconsin Act 191 created a state New Markets Tax Credit for investments in community development entities. The credit is 50% of the investment, taken in years three through seven. It has two pools of $12.5 million a year, one for rural counties and one for metro counties, with a $125 million lifetime cap and a $10 million cap per project. Applications opened in June 2026, and the first round was claimed in a day.

What it means for your project: Wisconsin manufacturing, food processing, and healthcare projects in eligible tracts can stack this with federal NMTC. Get into a CDE’s pipeline before the next round opens. Waiting until it opens is too late.

Source: AB 676, enacted as 2025 Wisconsin Act 191, The Incentives Negotiator, Sep 16, 2026. Full guide: Wisconsin incentive programs.

Apr 1, 2026 · MassachusettsProgram change

Massachusetts raises Workforce Training Fund grants to $200,000

What changed: Commonwealth Corporation raised the Workforce Training Fund General Program maximum from $125,000 to $200,000.

What it means for your project: Larger training grants are available for a Massachusetts expansion. Apply before the training starts.

Source: Commonwealth Corporation, expanded training grants. Full guide: Massachusetts incentive programs.

Feb 10, 2026 · IdahoTax change

Idaho decouples from federal factory expensing and cuts its rate to 5.3%

What changed: HB 559 (2026), retroactive to January 1, 2025, decoupled Idaho from federal 100% expensing for qualified production property (IRC 168(n)). HB 40 (2025) cut the flat corporate and individual income tax rate to 5.3% for 2025.

What it means for your project: New Idaho factory buildings do not get the federal first-year write-off on the state return. Lower rates also mean nonrefundable credits offset less tax.

Source: HB 559 (2026), Idaho Legislature, HB 40 (2025), Idaho Legislature. Full guide: Idaho incentive programs.

Jan 1, 2026 · OhioRepeal

Ohio repeals several sales tax exemptions, including printing equipment

What changed: House Bill 96, the 2025 budget, repealed several sales tax exemptions on January 1, 2026, including the exemption for machinery, equipment, and material used to produce printed material for sale. It also moved individual nonbusiness income to a flat 2.75% rate.

What it means for your project: Printers and print-adjacent manufacturers in Ohio should re-check equipment budgets. The general manufacturing machinery exemption still applies.

Source: House Bill 96 as enacted (LSC). Full guide: Ohio incentive programs.

Jan 1, 2026 · CaliforniaSunset

California’s New Employment Credit ends

What changed: The New Employment Credit is no longer available for tax years beginning on or after January 1, 2026. A bill to extend it was not enacted.

What it means for your project: Hiring in California’s designated geographic areas no longer earns a state credit. California Competes is the remaining route for a hiring-based credit.

Source: Franchise Tax Board, New Employment Credit. Full guide: California incentive programs.

Jan 1, 2026 · WashingtonSunset

Washington’s manufacturers sales tax deferral expires and a surcharge starts

What changed: The sales and use tax deferral for eligible manufacturing investment projects under chapter 82.85 RCW expired. On the same date, ESHB 2081 added a 0.5% surcharge on Washington taxable income over $250 million through 2029, with manufacturing income excluded.

What it means for your project: No new deferral awards for large Washington manufacturing projects. The rural county deferral under chapter 82.94 RCW is what remains.

Source: Washington DOR, incentive programs, Washington DOR, surcharge on high-grossing businesses. Full guide: Washington incentive programs.

Jan 1, 2026 · North CarolinaTax change

North Carolina’s corporate rate drops to 2%

What changed: The corporate income tax rate dropped to 2% for 2026. It is scheduled to fall to 1% in 2028 and 0% after 2029.

What it means for your project: With the corporate rate heading to zero, North Carolina’s discretionary JDIG grants and local incentives matter more than tax credits.

Source: G.S. 105-130.3. Full guide: North Carolina incentive programs.

Jan 1, 2026 · ArizonaRepeal

Arizona repeals the Quality Jobs credit and the refundable R&D credit

What changed: Chapter 140, Laws 2026 repealed the Quality Jobs tax credit and the refundable portion of the R&D credit for tax years beginning January 1, 2026. It also raised the minimum investment for the Manufacturing Public Infrastructure Program to $3 billion in large counties and $100 million in smaller counties.

What it means for your project: Arizona’s main state tool for a new plant is now the Qualified Facility credit, plus Foreign Trade Zone property tax savings at the local level. Older summaries that list Quality Jobs are out of date.

Source: Chapter 140, Laws 2026 summary. Full guide: Arizona incentive programs.

Jan 1, 2026 · MississippiTax change

Mississippi’s franchise tax drops to $0.50 per $1,000 on its way to repeal

What changed: Mississippi’s franchise tax on capital is $0.50 per $1,000 for 2026 and $0.25 for 2027, and it is repealed January 1, 2028. Under HB 1 of 2025, the individual income tax rate also falls to 4% in 2026 and steps down to 3% by 2030. The corporate rate stays at 5%.

What it means for your project: Capital-heavy plants pay less each year. MFLEX credits aimed at franchise tax lose value as it phases out, so plan to use them against income, sales, use, and withholding tax.

Source: Mississippi DOR, 2025 corporate income and franchise tax instructions, Mississippi DOR, 2025 legislation. Full guide: Mississippi incentive programs.

Jan 1, 2026 · IowaReplacement

Iowa replaces High Quality Jobs with Business Incentives for Growth

What changed: SF 657 (2025 Iowa Acts, chapter 136) repealed the High Quality Jobs Program on December 31, 2025. Business Incentives for Growth (BIG) took its place on January 1, 2026. BIG offers a sales tax refund, a refundable investment credit, and a local property tax exemption. Total incentives are capped at 5% of investment, or 7.5% in counties of 20,000 people or fewer, and the program has a $50 million yearly cap. Existing High Quality Jobs agreements continue.

What it means for your project: Iowa incentives are now tied to capital investment with a hard percentage cap. Older guides that describe High Quality Jobs are out of date.

Source: SF 657 (2025), Legislative Services Agency summary, IEDA, Business Incentives for Growth. Full guide: Iowa incentive programs.

2026 · UtahSunset

Utah enterprise zone designations have all expired

What changed: All Utah enterprise zone designations have expired, and the program ends in 2027. Filings in 2026 are only for the 2023 and 2024 tax years. Utah also cut its income tax rate to 4.45% for 2026 under SB 60.

What it means for your project: New Utah projects should not plan on enterprise zone credits. EDTIF and Rural EDTIF remain the main state tools.

Source: Utah Governor’s Office of Economic Development, enterprise zones, Utah Code 59-7-104. Full guide: Utah incentive programs.

2026 assessment · IndianaTax change

Indiana raises the business personal property exemption to $2 million

What changed: Senate Enrolled Act 1 (2025), as amended by House Enrolled Act 1427, raised the business personal property exemption from $80,000 to $2 million per county starting with the 2026 assessment date. It also removed the 30% minimum valuation floor for equipment placed in service after January 1, 2025, outside older TIF areas.

What it means for your project: Equipment-heavy projects in Indiana carry a lower property tax bill before any abatement. That changes how much a local abatement is worth in the negotiation.

Source: Indiana DLGF, 2025 legislation affecting assessment. Full guide: Indiana incentive programs.

Jan 1, 2026 · New YorkSunset

START-UP NY closes to new applicants

What changed: START-UP NY stopped accepting new applicants on January 1, 2026.

What it means for your project: New York offers now run through the Excelsior Jobs Program, NYPA power allocations, and local IDA abatements.

Source: Empire State Development, START-UP NY. Full guide: New York incentive programs.

Jan 1, 2026 · LouisianaRepeal

Louisiana repeals its corporate franchise tax

What changed: Louisiana’s corporate franchise tax was repealed starting in 2026 as part of the 2024 tax reform.

What it means for your project: Capital-heavy companies no longer pay a tax on their Louisiana capital base, which lowers the ongoing cost of a large plant.

Source: Louisiana Department of Revenue, 2024 tax reform summary. Full guide: Louisiana incentive programs.

Jan 1, 2026 · IowaReplacement

Iowa’s R&D credit becomes application-based with a $40 million cap

What changed: For tax years beginning January 1, 2026, SF 657 replaced the Research Activities Credit with an application-based R&D credit of up to 3.5%. The credit has a $40 million statewide cap and requires CPA verification of expenses.

What it means for your project: Iowa R&D credits are no longer automatic. Apply early and budget for the CPA review.

Source: IEDA, R&D tax credit program. Full guide: Iowa incentive programs.

Jan 1, 2026 · TexasTax change

Texas swaps its R&D sales tax exemption for a larger refundable credit and raises the personal property exemption

What changed: SB 2206 (2025) ended the R&D sales tax exemption on January 1, 2026 and raised the franchise tax R&D credit from 5% to 8.722%, now refundable with a 20-year carryforward. Proposition 9 raised the business personal property exemption from $2,500 to $125,000 per location starting in 2026.

What it means for your project: R&D-heavy manufacturers should model the credit instead of the exemption. Smaller sites may now owe little or no business personal property tax.

Source: SB 2206 (89th Legislature), bill history. Full guide: Texas incentive programs.

Jan 1, 2026 · ArkansasRule change

Arkansas lets ArkPlus credits offset sales tax

What changed: Act 881 of 2025 lets the ArkPlus investment tax credit offset sales and use tax as well as income tax, and adds a headquarters relocation credit. Act 882 of 2025, effective October 1, 2025, created a Modernization and Automation Tax Credit of up to 5% of costs for existing companies investing $25 million or more, capped at $2 million a year. Arkansas also cut its top corporate rate to 4.3% in 2024 and to 4.1% starting in 2027.

What it means for your project: Companies that owe little Arkansas income tax can now use ArkPlus credits. Existing plants that automate without adding jobs have a credit for the first time.

Source: Arkansas House, 2025 legislation effective January 1, 2026, Arkansas Economic Development Commission, investment incentives. Full guide: Arkansas incentive programs.

Jan 1, 2026 · WyomingTax change

Wyoming exempts the first $75,000 of business personal property

What changed: SF 48 (2025) raised the business personal property exemption from $2,400 to $75,000 per county, starting January 1, 2026.

What it means for your project: A small saving for a large plant, but meaningful for small shops and satellite sites. Industrial property is still assessed at 11.5%.

Source: SF 48 (2025), Wyoming Legislature. Full guide: Wyoming incentive programs.

Jan 1, 2026 · PennsylvaniaTax change

Pennsylvania’s corporate rate falls to 7.49%

What changed: The corporate net income tax fell to 7.49% on January 1, 2026. It drops to 6.99% in 2027 and reaches 4.99% in 2031.

What it means for your project: Pennsylvania’s corporate tax is falling every year through 2031. Long-horizon cost models should use the scheduled rates, not today’s.

Source: PA Department of Revenue, corporation tax rates. Full guide: Pennsylvania incentive programs.

Jan 1, 2026 · KentuckyTax change

Kentucky’s income tax cut shrinks KBI wage assessments

What changed: The individual income tax rate fell from 4% to 3.5% on January 1, 2026. KBI wage assessments are tied to that rate.

What it means for your project: A lower rate means a smaller wage assessment each year, so a KBI award takes longer to recover. Projects approved before February 2023 are protected under HB 869.

Source: HB 1 (2025 Regular Session). Full guide: Kentucky incentive programs.

2026 tax year · MarylandTax change

Maryland decouples from federal factory expensing

What changed: The Budget Reconciliation and Financing Act of 2026 permanently decoupled Maryland from federal 100% expensing for qualified production property (IRC 168(n)). A 2025 law also added a 3% sales tax on data, IT, and software services from July 1, 2025.

What it means for your project: A new Maryland plant cannot fully expense the building on the state return. IT and software work bought for a project now carries sales tax.

Source: Comptroller of Maryland, tax alert on federal changes, Comptroller of Maryland, Technical Bulletin 30. Full guide: Maryland incentive programs.

Jan 1, 2026 · NebraskaTax change

Nebraska’s corporate rate falls to 4.55%, then 3.99% in 2027

What changed: Under LB 754 (2023), Nebraska’s corporate and top individual income tax rate is 4.55% for 2026 and drops to 3.99% on January 1, 2027.

What it means for your project: Lower income tax means ImagiNE credits used against income tax are worth less. Credits that offset withholding or sales tax matter more.

Source: Nebraska Revised Statute 77-2734.02. Full guide: Nebraska incentive programs.

Jan 1, 2026 · MaineNew program

Maine authorizes a new round of state New Markets Tax Credits

What changed: PL 2025 c. 497 (LD 1217) gave the Finance Authority of Maine new state New Markets credit allocation authority. CDEs must now issue qualified equity investments and deploy 85% of them within 12 months instead of 24.

What it means for your project: Maine projects in eligible tracts can pair state NMTC with federal NMTC. Deployment deadlines are tighter, so projects need to be ready to close when a CDE commits.

Source: Maine Legislature, PL 2025 c. 497. Full guide: Maine incentive programs.

2025 state incentive program changes

Nov 19, 2025 · DelawareTax change

Delaware decouples from federal bonus depreciation and factory expensing

What changed: HB 255, passed in a special session, decoupled Delaware’s corporate income tax from federal 100% bonus depreciation and 168(n) expensing for qualified production property.

What it means for your project: Equipment-heavy Delaware projects get slower state depreciation than federal. Model state tax on the older rules.

Source: Delaware Division of Revenue, HB 255 technical information memorandum. Full guide: Delaware incentive programs.

Nov 1, 2025 · OklahomaRule change

Oklahoma counts contract workers for Quality Jobs and adds reporting to the five-year exemption

What changed: SB 586 (2025) treats leased or contracted workers as employees of the establishment for Quality Jobs. SB 577 (2025) requires companies with the five-year manufacturing ad valorem exemption to report job and payroll data to the Oklahoma Tax Commission, which shares it with the Incentive Evaluation Commission. HB 2768 (2025) raised the investment limit for leveraging Quality Jobs payments to $700 million. In 2026, HB 4426 extended the SIDE Act credit to tax years ending in 2032.

What it means for your project: Staffing-agency workers can now count toward Quality Jobs. Expect your exemption data to be reviewed and made more public.

Source: Oklahoma Tax Commission, 2025 legislative update. Full guide: Oklahoma incentive programs.

Oct 1, 2025 · FloridaRepeal

Florida repeals the sales tax on commercial rent

What changed: HB 7031 (Chapter 2025-208) repealed the state sales tax and local surtax on commercial rent, effective October 1, 2025.

What it means for your project: Leased plants and warehouses in Florida no longer pay sales tax on rent. That lowers the cost of a leased facility compared with a few years ago.

Source: Florida Department of Revenue, TIP 25A01-04. Full guide: Florida incentive programs.

Oct 1, 2025 · WashingtonTax change

Washington raises service B&O rates and taxes more services

What changed: ESHB 2081 raised service B&O rates to 1.75% above $1 million and 2.1% above $5 million. ESSB 5814 applied sales tax to IT support, custom software, temporary staffing, and advertising. Starting January 1, 2027, the manufacturing B&O rate rises from 0.484% to 0.5%. A 2026 law repeals most of the new services sales tax in 2029, though advertising stays taxed.

What it means for your project: Add sales tax to software, staffing, and IT lines in a Washington project budget, and model the 0.5% manufacturing B&O rate from 2027.

Source: Washington DOR, 2025 tax legislation, ESHB 2081 final bill report. Full guide: Washington incentive programs.

Oct 1, 2025 · NevadaRule change

Nevada makes cities and counties the lead negotiators for large projects

What changed: SB 69 (2025, Statutes of Nevada chapter 334) made local governments the lead negotiators in economic diversification districts. Large projects must sign agreements covering local service costs of up to 10% of the abatements. A new law, NRS 360.7573, also lets the Board of Economic Development deny, reduce, or condition abatements based on water use, environmental and community impact, and financial stability.

What it means for your project: Large Nevada deals are now negotiated with the city or county as well as the state, and part of the abatement value goes back to local services. Water-heavy projects should address water use in the application.

Source: Statutes of Nevada 2025, NRS chapter 360. Full guide: Nevada incentive programs.

Sep 25, 2025 · New JerseyNew program

New Jersey opens Next NJ Manufacturing, a $500 million credit program

What changed: Next NJ Manufacturing, created by A5687/S4407 (signed August 13, 2025), opened for applications September 25, 2025. It offers up to $150 million in tax credits per project from a $500 million program, for projects with at least 20 new jobs, $10 million of investment, and pay of at least 120% of the county manufacturing median wage. It is open to March 1, 2029. Next NJ AI and the Manufacturing Voucher Program Phase 3 are fully allocated and closed.

What it means for your project: This is New Jersey’s biggest manufacturing incentive in years. A $500 million pool with awards up to $150 million can be used up by a few large projects, so apply early.

Source: NJEDA, Next NJ Manufacturing. Full guide: New Jersey incentive programs.

Jul 11, 2025 · West VirginiaNew program

West Virginia lets large industrial users build their own power

What changed: HB 2014 (2025), the Power Generation and Consumption Act, created certified microgrid districts for industrial expansions and large data centers, outside Public Service Commission rate jurisdiction. HB 2002 (2025) set up one-stop shop permitting.

What it means for your project: Power-hungry plants can pursue on-site or dedicated generation in West Virginia. Make power supply part of the incentive negotiation.

Source: Office of the Governor of West Virginia, bill signing. Full guide: West Virginia incentive programs.

Jul 1, 2025 · LouisianaReplacement

Louisiana replaces Quality Jobs and Enterprise Zone with High-Impact Jobs

What changed: Quality Jobs and the Enterprise Zone program stopped accepting new advance notifications after June 30, 2025. The High-Impact Jobs Program took effect July 1, 2025 as the replacement. Existing contracts continue.

What it means for your project: New Louisiana projects apply under High-Impact Jobs. ITEP remains the main property tax tool.

Source: Louisiana Economic Development, High-Impact Jobs. Full guide: Louisiana incentive programs.

Jul 1, 2025 · WyomingExtension

Wyoming extends its manufacturing machinery tax exemption to 2042

What changed: HB 11 (2025, Act 43) extended the sales and use tax exemption for manufacturing machinery from 2027 to December 31, 2042, and aligned the use tax side with the sales tax side.

What it means for your project: Equipment for a Wyoming plant stays tax-free for the life of a long project. With no corporate or personal income tax, this exemption is one of the main state cost advantages.

Source: HB 11 (2025) digest, Wyoming Legislature. Full guide: Wyoming incentive programs.

Jul 1, 2025 · MinnesotaFunding cut

Minnesota cuts the Job Creation Fund and loosens the Forward Fund

What changed: The 2025 special session jobs law (Laws 2025, 1st Special Session, chapter 6) funded the Job Creation Fund at about $4.95 million a year for FY2026 and FY2027 and cancelled $3 million of FY2025 money. It dropped the requirement that Forward Fund awards match federal funds and raised the Minnesota Job Skills Partnership maximum grant from $400,000 to $500,000. In 2026, the Legislature moved $15 million out of the Forward Fund to the general fund.

What it means for your project: Minnesota job creation awards are smaller and more competitive. The Forward Fund is now open to projects without federal money, but it has less left to give.

Source: Laws 2025, 1st Special Session, chapter 6, Minnesota Management and Budget, 2026 end of session summary. Full guide: Minnesota incentive programs.

Jul 1, 2025 · VirginiaSunset

Virginia’s Major Business Facility Job Tax Credit expires

What changed: The Major Business Facility Job Tax Credit expired July 1, 2025. Virginia Tax lists it as an expired credit. The Governor’s Opportunity Fund now operates as the Commonwealth’s Development Opportunity Fund (COF).

What it means for your project: Virginia offers now center on COF grants, VIP grants, and the Virginia Talent Accelerator Program.

Source: Virginia Tax, expired or repealed credits. Full guide: Virginia incentive programs.

Jun 30, 2025 · NevadaSunset

Nevada’s transferable credits for mega-projects sunset

What changed: The transferable tax credits paired with Nevada’s $1 billion and $3.5 billion abatement programs, worth $9,500 per qualified employee, sunset June 30, 2025.

What it means for your project: New mega-projects in Nevada get the tax abatements but not the cash-like credits that came with them before.

Source: Nevada GOED, programs and incentives. Full guide: Nevada incentive programs.

Jun 30, 2025 · ConnecticutTax change

Connecticut extends its 10% corporate surtax through 2028

What changed: Public Act 25-168 extended the 10% corporate surtax through income year 2028. For income years starting in 2025, it also removed the $2.5 million cap on combined unitary tax and ended the 2015 NOL election.

What it means for your project: Large companies and combined groups keep paying the surtax, and tax credits cannot offset it. Model the uncapped liability before counting on Connecticut credits.

Source: Connecticut DRS, corporation business tax information, Connecticut DRS, 2025 developments. Full guide: Connecticut incentive programs.

May 17, 2025 · North DakotaTax change

North Dakota caps local property tax levy growth at 3%

What changed: HB 1176 (2025) capped annual growth in local property tax levies at 3%. SB 2154 (2025) also amended the definition of primary sector business, which controls certification and the new and expanding business exemptions.

What it means for your project: Local levy growth is capped, but an individual plant’s bill can still rise more than 3%. Confirm primary sector certification under the new definition before relying on exemptions.

Source: Office of the Governor of North Dakota, property tax package, North Dakota Legislature, SB 2154. Full guide: North Dakota incentive programs.

Apr 15, 2025 · MassachusettsProgram overhaul

Massachusetts redesigns EDIP after the Mass Leads Act

What changed: The Mass Leads Act (Chapter 238 of 2024, signed November 20, 2024) removed the $5 million cap on refundable EDIP credits, let EDIP offset more than half of tax liability, and allowed it to be combined with the 3% investment tax credit. Local TIF and special tax assessment agreements no longer need state approval. The life sciences credit cap rose to $40 million a year, and a new $30 million Climatetech Tax Incentive Program was created. In April 2025 the state moved EDIP to a one-step application, with awards typically running $10,000 to $15,000 per job.

What it means for your project: Manufacturers can now stack EDIP with the investment tax credit, and property tax deals are settled with the town alone. Plan EDIP around job counts, since awards are sized per job.

Source: Massachusetts DOR, TIR 25-5, Mass.gov, EDIP reforms. Full guide: Massachusetts incentive programs.

Jan 1, 2025 · New HampshireRepeal

New Hampshire repeals its interest and dividends tax

What changed: New Hampshire’s Interest and Dividends Tax was repealed starting in 2025. The state now has no personal tax on wages, interest, or dividends. Business Profits Tax stays at 7.5% and Business Enterprise Tax at 0.55%. In 2026, HB 1102 raised the R&D credit cap per taxpayer to $100,000 starting in 2027.

What it means for your project: Owners and managers who relocate to New Hampshire pay no state personal income tax. Business tax rates are stable for modeling.

Source: New Hampshire DRA, interest and dividends tax repeal. Full guide: New Hampshire incentive programs.

Jan 1, 2025 · MaineReplacement

Maine closes Pine Tree Development Zones and ETIF and starts the Dirigo credit

What changed: Pine Tree Development Zones and Employment Tax Increment Financing closed to new applicants after December 31, 2024. The Dirigo Business Incentives credit started January 1, 2025: a 10% capital investment credit (5% in the three southern counties) plus $2,000 per trained worker, capped at $2 million with $500,000 refundable. The 1.2% Capital Investment Credit also expired after tax year 2024.

What it means for your project: New Maine projects use Dirigo, not PTDZ. Certify with DECD before spending, because only investment after the certification letter counts.

Source: Maine DECD, Dirigo Business Incentives, 36 MRSA 6763. Full guide: Maine incentive programs.

Jan 1, 2025 · New MexicoTax change

New Mexico flattens its corporate rate and creates an advanced energy equipment credit

What changed: HB 252 (2024) set a flat 5.9% corporate income tax rate, removing the 4.8% bracket for income under $500,000, and added Subpart F income to the base. It also created a transferable Advanced Energy Equipment credit worth the lesser of 20% of qualified spending or $25 million, with a $25 million statewide annual cap, through 2032.

What it means for your project: Clean energy component manufacturers can get a large transferable credit in New Mexico, but the statewide cap is first come, first served.

Source: HB 252 (2024) fiscal impact report. Full guide: New Mexico incentive programs.

2024 state incentive program changes

Aug 14, 2024 · AlaskaRule change

Alaska lets cities and boroughs fully exempt economic development property

What changed: SB 179, signed August 14, 2024, lets municipalities fully exempt or defer property tax on economic development property. It also bans real estate transfer taxes.

What it means for your project: In Alaska, the property tax deal is with the city or borough, and a full exemption is now possible. Alaska has few state incentive programs, so this local tool matters.

Source: Alaska Senate, SB 179 signing release. Full guide: Alaska incentive programs.

Jun 1, 2024 · MarylandSunset

Maryland’s More Jobs for Marylanders closes to new manufacturers

What changed: More Jobs for Marylanders closed to new enrollment. Only companies enrolled before the sunset keep claiming the credit.

What it means for your project: New Maryland manufacturing projects should look to the Job Creation Tax Credit and MEDAAF instead.

Source: Maryland Commerce, More Jobs for Marylanders. Full guide: Maryland incentive programs.

Jan 1, 2024 · OklahomaRepeal

Oklahoma repeals its franchise tax

What changed: HB 1039X (2023) repealed Oklahoma’s franchise tax. Tax year 2023 was the last return.

What it means for your project: Corporations no longer pay an annual tax on Oklahoma capital.

Source: Oklahoma Tax Commission, other business taxes. Full guide: Oklahoma incentive programs.

Coming up

DateStateWhat happens
Jan 1, 2027PennsylvaniaCorporate net income tax drops to 6.99%.
Jan 1, 2027AlabamaAct 2026-573 changes data center abatement rules.
2027ArizonaCommercial and industrial assessment ratio falls to 15%.
2028North CarolinaCorporate income tax rate falls to 1%, then 0% after 2029.
Jul 31, 2028AlabamaAlabama Jobs Act and Growing Alabama sunset unless extended.
Jan 1, 2028CaliforniaCAEATFA sales tax exclusion authority runs through this date unless extended.
Jun 30, 2027IllinoisEDGE takes no new agreements after this date unless extended.
Dec 31, 2028IllinoisMICRO and REV take no new agreements after this date.
Aug 28, 2030MissouriMissouri Works and Missouri One Start expire unless reauthorized.
Dec 15, 2026IowaLegislative study of 260E training due, with recommendations for the 2027 session.
Spring 2027IowaIEDA expects the new BIG training fund to open.
Dec 31, 2028New JerseyThe 2.5% Corporate Transit Fee is scheduled to end.
Mar 1, 2029New JerseyEmerge and Next NJ Manufacturing take no new applications after this date unless extended.
Jan 1, 2027WashingtonManufacturing B&O rate rises from 0.484% to 0.5%.
Jan 1, 2027ArkansasTop corporate income tax rate falls to 4.1%.
Jun 30, 2032OregonNon-tribal enterprise zones stop taking authorizations.
Jan 1, 2027NebraskaCorporate income tax rate falls to 3.99%.
Dec 31, 2030IdahoIdaho Business Advantage credits end for tax years after 2030.
Jul 1, 2027South DakotaState sales tax rate rises from 4.2% to 4.5% under SDCL 10-45-2. Manufacturing equipment is taxable in South Dakota, so this raises project costs unless the Reinvestment Payment Program applies.
Jan 1, 2028MississippiFranchise tax repealed.
Jan 1, 2027New MexicoDecoupling from federal bonus depreciation and factory expensing takes effect for tax year 2027.
Jan 1, 2028New HampshireEconomic Revitalization Zone credit is scheduled to be repealed unless extended.
Dec 31, 2034MaineExisting ETIF benefits end.
Nov 9, 2026North DakotaLIFT technology loan applications due.
Jan 4, 2027CaliforniaCalifornia Competes period 2 opens and runs through Jan 25. Period 3 runs Mar 1 to Mar 15.
Nov 10, 2026PennsylvaniaManufacturing PA Innovation Program proposals due at 5 p.m. University research teams apply with a Pennsylvania manufacturer partner. Awards run $25,000 to $70,000.
Dec 31, 2027IowaLast day to enter a MEGA agreement that can use the transferable 10% rural credit under HF 2801.
Jun 30, 2029ArizonaPause on new computer data center certifications ends unless extended or made permanent.
Nov 17, 2026IllinoisFall veto session runs Nov 17 to 19 and Dec 1 to 3. Watch for data center legislation to replace the paused Data Center Investment Program.
Dec 31, 2026OklahomaLast day to file 2026 R&D Rebate applications. Commerce says no money is appropriated, so payment is not guaranteed.
Jan 8, 2027IndianaADAPT grant applications due for Indiana auto suppliers with fewer than 1,500 employees.
Nov 20, 2026IowaLast day to request the CIRAS assessment required for the Manufacturing 4.0 Technology Investment grant. Applications run Jan 4 to 29, 2027. Up to $75,000 with a 1:1 match for manufacturers with 3 to 124 full time employees.
Dec 30, 2026CaliforniaReadopted emergency regulations for the CAEATFA sales tax exclusion expire unless regular rulemaking is finished.
Jan 1, 2027FloridaAmendment 3 takes effect. The assessment growth cap on non-homestead property falls from 10% to 5%.

Is a change about to cost your project money?

Send us the basics: location, jobs, capital investment, and timing. We will tell you which programs still apply and what they are worth, within one business day. We work for the company, and we are paid through flat fees and success fees, never hourly.

Get the free incentives analysisGet changes by email in The Incentives Negotiator

Incentive changes FAQ

Is the Michigan Business Development Program still available?
No. MBDP sunset on September 30, 2026, and MEDC had stopped approving new awards before that date. Michigan still offers PA 198 property tax abatements, Renaissance Zones, and sales and personal property tax exemptions for manufacturers.
What did Georgia HB 463 repeal?
HB 463 repealed, effective January 1, 2026, the port activity credit bonus, the headquarters credit, the PPE and life sciences manufacturing job credits, the electric vehicle and charger credits, and several smaller credits. It also cut carryforwards for most remaining credits from 10 years to 5.
Does Arizona still have the Quality Jobs tax credit?
No. Chapter 140, Laws 2026 repealed it for tax years beginning January 1, 2026, along with the refundable portion of the R&D credit.
What replaced Louisiana’s Quality Jobs program?
The High-Impact Jobs Program, which took effect July 1, 2025. Quality Jobs and the Enterprise Zone program stopped taking new applications after June 30, 2025.
What are Kentucky heritage counties?
Heritage counties replaced Kentucky’s enhanced incentive counties under HB 869, signed April 27, 2026. Projects in heritage counties get longer KBI terms, a lower wage floor, and higher training and site development caps.
Does Pennsylvania still have the Job Creation Tax Credit?
No. It sunset on June 30, 2019. Pennsylvania’s main discretionary program is PA First.
Does Texas still have Chapter 313?
No. Chapter 313 expired at the end of 2022. JETI replaced it with a 10-year limit on school district property taxes for qualifying projects.
How often do state incentive programs change?
Every legislative session. In 2025 and 2026 alone, at least seven states repealed, replaced, or sunset a major incentive program. Check the current terms before you build an incentive into a project budget.

Related guides and tools

Each entry is checked against the official source linked with it. Incentive programs change often. Confirm current terms before relying on them for a decision.

© 2026 Five Points Strategic Advisors. All rights reserved.